Analisis Penjadwalan Ulang Proyek Denagan Menggunakan Metode Project Evaluation and Revier Tencnique (part)
Abstract
Projects generally have a deadline, meaning that the project must be completed before or at the specified time. Regarding project problems, the success of the project implementation on time is an important goal for both project owners and contractors. In the implementation of the project often occurs in some jobs that do not go according to plan, for example in the implementation of the construction project of Type B RSUD Magelang on foundation work and the structure has some delay in the completion of work The delay is influenced by several factors. There are several project scheduling techniques, one of which is the PERT method. PERT (Project Evaluation and Review Technique) is a project scheduling method based on networks that requires three presumptive times for each activity, namely, optimistic (a), pessimistic (b), and most likely (m). Based on the results of the analysis and calculations that have been made, the time needed to carry out the foundation work to the project structure work is 301 days. In the time schedule for the existing project plan, it takes 217 days with the possibility of a project probability of 22.06%. This is likely the probability of the project to be completed with a target of 217 days and a probability of 22.06% the possibility of the work being completed is very low. Calculations made using the PERT method have considered the possibilities that will occur at the time of implementation, possibly good or bad.
Collections
- Civil Engineering [4205]