ANALISIS PENJADWALAN ULANG DENGAN MENGGUNAKAN METODE PERT (PROGRAM EVALUATION AND REVIEW TECHNIQUE) (RESCHEDULING ANALYSIS WITH PERT METHODE) (Studi Kasus: Hotel Bhayangkara)
dc.contributor.advisor | Fitri Nugraheni, S.T., M.T., Ph.D. | |
dc.contributor.author | Ahmad Syaiful, 12511333 | |
dc.date.accessioned | 2019-01-17T06:10:17Z | |
dc.date.available | 2019-01-17T06:10:17Z | |
dc.date.issued | 2018-11-28 | |
dc.identifier.uri | https://dspace.uii.ac.id/handle/123456789/12908 | |
dc.publisher | Universitas Islam Indonesia | en_US |
dc.title | ANALISIS PENJADWALAN ULANG DENGAN MENGGUNAKAN METODE PERT (PROGRAM EVALUATION AND REVIEW TECHNIQUE) (RESCHEDULING ANALYSIS WITH PERT METHODE) (Studi Kasus: Hotel Bhayangkara) | en_US |
dc.type | Undergraduate Thesis | en_US |
Files in this item
This item appears in the following Collection(s)
-
Civil Engineering [4232]