Department of Civil Engineering: Recent submissions
Now showing items 21-39 of 39
-
Penerapan BIM 4D dalam perencanaan penjadwalan pada pekerjaan struktur jembatan
(Proceeding Civil Engineering Research Forum, 2023-07-18)Currently, many project scheduling plans are still done conventionally, often resulting in errors due to a lack of precision. The development of the construction industry has prompted construction practitioners to adopt ... -
Risk assessment berdasarkan konsep 4 pilar keselamatan konstruksi pada pekerjaan blasting
(Proceeding Civil Engineering Research Forum, 2023-07-18)The construction sector is a high-risk business sector. One of the risks in the construction world can be sourced from construction safety aspects following PERMEN PUPR No. 10 of 2021 (labor, tools, materials, ... -
Perbandingan realisasi biaya pelaksanaan tehadap rab berbasis bim 5d pada pekerjaan struktural bangunan
(Proceeding Civil Engineering Research Forum, 2023-07-18)Planning estimate cost for a project in these days is dominated by conventional methods. This results in numerous mistakes, inaccuracies, and waste material in project planning. Whereas, if the project’s funding have ... -
Analisis risiko pada pekerjaan pembangunan Bendungan Bener Kabupaten Purworejo Paket 4 (MYC)
(Proceeding Civil Engineering Research Forum, 2023-07-18)Infrastructure development in Indonesia is carried out to improve the welfare of the society. The Bener Dam Construction Project Package 4 (MYC) in Purworejo Regency is utilized to fulfill the water supply of 1500 l/dt, ... -
Analisis kombinasi alat berat pekerjaan timbunan pada proyek penataan landfill zona b tpa piyungan
(Proceeding Civil Engineering Research Forum, 2023-07-18)Zona B Landfill Arrangement of TPA Regional Piyungan Project is a project that aims to close TPA in the zone to become a green open space. The heavy equipment used for heap work is excavators and bulldozers with a solid ... -
Analisis penjadwalan waktu pelaksanaan proyek dengan Linear Scheduling Method (LSM) pada proyek pembangunan perumahan
(Proceeding Civil Engineering Research Forum, 2023-07-18)Project scheduling is one of the planning results that can provide information about the schedule or time of the plan and the progress of the project in the performance of resources in the form of equipment, materials, ... -
Analisis progres realisasi proyek terhadap biaya pada proyek jembatan kereta api rangka baja Surakarta
(Proceeding Civil Engineering Research Forum, 2023-07-18)The steel frame railway bridge construction project in Surakarta is an ongoing national strategic project. Analysis of the progress of project realization on the cost of implementing important infrastructure projects is ... -
Pengaruh penggunaan serbuk kayu dan kapur tohor sebagai bahan subtitusi pada campuran bata ringan cellular lightweight concrete
(Proceeding Civil Engineering Research Forum, 2023-07-18)The important component in the building is the wall. Lightweight brick is an alternative material commonly used to replace red brick as a wall material. The use of lightweight bricks is considered more efficient ... -
Evaluasi kinerja struktur atas pada desain gedung perkantoran menggunakan analisis pushover berdasarkan atc-40 terhadap beban gempa level besar (maximum considered earthquake, risk targeted)
(Proceeding Civil Engineering Research Forum, 2023-07-18)Based on performance-based design, pushover analysis is used to forecast how buildings will behave during earthquakes. The approach is to gradually apply a pattern of static lateral loads on the structure until it reaches ... -
Penggunaan artificial neural network (ANN) untuk memprediksi nilai demand capacity ratio (DCR) pada struktur atas jembatan rangka bina marga kelas A bentang 45 meter
(Proceeding Civil Engineering Research Forum, 2023-07-18)Demand capacity ratio (DCR) is the ratio between the number of demand to the capacity available in a system in a given period of time. If the DCR exceeds 1, it means that the bridge has exceeded its capacity and has ... -
Analisis baut dynabolt pada shoring proyek jembatan rangka baja Simpang Joglo Surakarta
(Proceeding Civil Engineering Research Forum, 2023-07-18)Bolted structures play an important role in various civil engineering and mechanical applications. Bolts are used to connect structural elements, providing strength and stability to the construction. Previous research has ... -
Pengaruh pengisian beton dan penambahan tulangan untuk perkuatan spun pile terhadap kekuatan dan daktilitas lentur
(Proceeding Civil Engineering Research Forum, 2023-07-18)The spun pile is a structural component that can accept lateral loads that cause internal forces in the form of bending moments. In the field, the need to use spun piles as the foundation of a building has been widely ... -
Studi komparasi hasil desain gedung A rumah sakit universitas muhammadiyah semarang
(Proceeding Civil Engineering Research Forum, 2023-07-18)The development of higher education in Semarang City has made Muhammadiyah Semarang University (UNIMUS) strive to continue to improve the quality and quantity of facilities and infrastructure to support lecture activities. ... -
PENGOLAHAN LIMBAH PRAKTIKUM MENGGUNAKAN ALAT PENYULINGAN SEBAGAI BAHAN PRAKTIKUM KELARUTAN ASPAL DENGAN TETRA CHLORO ETHYLENE (TCE)
(Jurusan Teknik Sipil, 2023-02)Waste is material resulting from an activity or process that will no longer be used and can have a negative impact on society if it is not managed properly. The definition of waste can be found in RI Menperindag ... -
ANALISIS PERBANDINGAN PERKERASAN AC-WC BERBAHAN IKAT STARBIT E-55 DENGAN PEN 60/70 MENGGUNAKAN METODE ELASTIK LINEAR
(Jurusan Teknik Sipil, 2022-07)Population growth has a significant impact on transportation demand. With proper road infrastructure, these traffic activities will go smoothly. As an important mobilization channel, roads must be able providing safety ... -
MODIFIKASI ANALISIS RISIKO DAN PENGENDALIAN METODE FMEA SAW DENGAN METODE DELPHI DALAM RPAM PDAM KOTA PEKALONGAN
(Jurusan Teknik Sipil, 2022-07)The research about risk management in PDAM study location in PDAM Pekalongan City, Central Java. The WSP-Operator begin with: (1) intake, (2) water treatment units, and (3) water distribution units. Hazard events that ... -
IDENTIFIKASI PENTINGNYA PENGENALAN PERANAN CIVITAS AKADEMIKA TEKNIK SIPIL DALAM MENURUNKAN TINGKAT KECELAKAAN BERKENDARA
(Jurusan Teknik Sipil, 2023-02)Traffic accidents are one of the biggest causes of death in Indonesia. Accidents occur due to several factors, namely human factors, vehicles, infrastructure, and the environment. From several factors, the most crucial ... -
PEMETAAN RISIKO BENCANA SEBAGAI DASAR UNTUK MITIGASI BENCANA TANAH LONGSOR DI DESA SRIMULYO KABUPATEN BANTUL
(Civil Engineering Research Forum (CE ReForm), 2022-02-14)landslides located on the morphology of the ridge to the hills in the eastern region of Bantul Regency. In each rainy season some areas in the village of Srimulyo landslides occurred. Based on the map of landslide incident ... -
ANALISIS RESPONS KETIDAKBERATURAN HORIZONTAL DAN VERTIKAL PADA GEDUNG PERKULIAHAN DI YOGYAKARTA DENGAN MENGGUNAKAN SNI 1726-2019
(Jurusan Teknik Sipil, 2023-02-15)Indonesia is a country vulnerable to earthquakes because it is located n the converging area of four large tectonic plates and it is surrounded by the pacific ring of fire. Yogyakarta is one of the cities that is the most ...